A better result starts with the right project brief.
The preferred playing surface, intensity of use and condition of the ground guide the specification. A new court and a resurfacing project may require very different work.
Illustrative photograph: Tomasz Krawczyk / Unsplash. Not a completed Zambia project.
PROJECT CONSIDERATIONS
What matters before installation
01 / PROJECT FACTOR
Preferred surface and intended playing use
02 / PROJECT FACTOR
Base stability, levels and drainage
03 / PROJECT FACTOR
Markings, net system, fencing and access
GOOD TO KNOW
Can an older tennis court be resurfaced?
It depends on the existing base, cracking, drainage and surface condition. Assessment of the current court helps establish the appropriate approach.